20ft 270 Series
-
Length | 5900mm
Width | 7110mm
Package Height | 3000mm
Installed Height with Gable roof | 3700mm
*Excluding height of footings
Weight | 6-7 tonnes
7 star + energy rating
NCC Compliant
-
ISO 9001 Certified Factory
AS/NZS 3678 Grade 350 Steel Used for Structural subframe
Hager Electrical component used on Certified homes.
Australian engineered and certified polyurethane core composite panel
Fluorocarbon resin paint 100 µm
Moisture-Barrier & Vapour Control Layering
Internal Bathroom Waterproofing System
Multi-Point QA Photo Audit
Digital Production Scheduling
Assembly-Line Tolerance Checks
Factory Rain Test & Water Simulation
Container Loading SOP with Weight Balancing
Material optimised CAD to minimise waste
-
Lead time: 30–45 days shipping
1 week customs clearance and unpack
Slew crane depending on site requirements
Semi truck delivery
*Disclaimer these are all estimations and recommendations
Floor Plans
1 Bed | 1 Bath
-
Welcome to your cosy, self-contained home with a kitchen and ensuite. Perfect for a quiet, functional, and comfortable retreat. It’s a warm, inviting space to unwind and feel at home.
-
Class 1A Complete | From $210,613 inc GST
1 Bed | 1 Bath
-
Experience a spacious, bright modular home. With a well-appointed kitchen and an ensuite bathroom, it blends convenience and ease, creating an inviting space to relax, recharge, and enjoy everyday life.
-
Class 1A Complete | From $210,613 inc GST
2 Bed | Shared Ensuite
-
This floor plan is a smart two-bedroom modular home that makes the most of a compact footprint. A central living space links a practical kitchen, a comfortable lounge and a spot to unwind, for easy everyday living.
-
Class 1A Complete | From $210,613 inc GST
Explore other models
Would you like an estimate?
Class 1A Certified
A Class 1A house under the National Construction Code
Meets Australian standards for safety, structure and living full time
We handle design, engineering, council approval, site prep, delivery, install and connections
Arrives finished. Move in about 4 months after council approval

